Our Facility
The Gulf Stream Energy F.Z.C facility comprises:
- An integrated distillation unit.
- A processing, dehydration and distillation unit.
- Main and intermediate tank farms.
- A laboratory for testing feedstock and products.
- A control building with a distributed control system (DCS).
- A covered loading area.
- Two dedicated truck weighbridges.
- A three-storey administration building.
All of it is run from a single site, shortening the distance between stages of work and reducing handling time.
Total distillation capacity: 2,000 tonnes per day. 1,500 t/day Distillation. 500 t/day Dehydration with distillation.
Key Figures
- Site area
- 30,450 m²
- Storage capacity
- 108,000 m³
Safety and the Environment
At Gulf Stream Energy F.Z.C, safety and environmental protection are part of how the facility is designed and operated — not something added afterwards.
| System | Purpose |
|---|---|
| Vapour recovery system | Limits vapour emissions during handling and loading. |
| Gas scrubber unit | Treats process gases before they are released. |
| Leak-detection piping | Identifies any leak at an early stage. |
| Wastewater holding tanks | Collect wastewater and keep it from reaching the soil. |
| Containment wall around the tank farm | Contains any spill within the site. |
| Independent firefighting network | A dedicated fire-water tank and fire pump room. |
Safety today · A cleaner tomorrow